# Project Brief Template: How to Write One in 10 Steps

> Use this project brief template to define goals, scope, roles, timeline and risks on one or two pages, so your team starts a project with the same plan.

Source: https://www.stacwise.com/blog/how-to-write-a-project-brief/
Updated: 2026-11-12

A project brief is a one or two page document that states why a project exists, what it will deliver, what is out of scope, who is involved and when it is due. Write it before work starts, get the sponsor to approve it, and keep it as the reference everyone returns to when scope starts to drift.

Here is the template, then how to fill in each part.

## The project brief template

```
Project name:
Sponsor:            Project lead:
Date:               Version:

1. Background and problem
2. Goal and success measures
3. Deliverables
4. Scope: included / not included
5. Audience or customer
6. Team and roles
7. Timeline and milestones
8. Budget and resources
9. Risks and assumptions
10. Approval
```

## Step by step

### 1. Background and problem

Two or three sentences on what is wrong or missing today. "Customers email us for quotes and we answer from memory, so replies take two days and vary in price." A reader who joins in month three should understand why this project exists.

### 2. Goal and success measures

State one goal, then how you will know it worked. Use measures you can check. "Cut quote reply time from two days to same day" is checkable. "Improve the quote process" is not. Only use numbers you actually have or plan to measure; do not invent targets to look rigorous.

### 3. Deliverables

List the concrete things that will exist at the end: a quote template, a price sheet, a three-page guide for staff. Each should be something you can point to and say done or not done.

### 4. Scope: included and not included

This is the most valuable section of a project scope document. Write a short list of what is in, and an equally honest list of what is out.

| In scope | Out of scope |
|---|---|
| Quote template for the three main services | Quotes for custom projects |
| Shared price sheet | Changing the prices themselves |
| One training session | Ongoing support |

When someone later asks for "just one more thing", point to this table.

### 5. Audience or customer

Who will use or benefit from the result? Name the group, and if possible a real example. This keeps decisions grounded: will a customer understand this?

### 6. Team and roles

List each person with one line on their role. Name one decision maker. A simple pattern is: sponsor approves, lead decides day to day, contributors do the work, and a short list of people to keep informed.

### 7. Timeline and milestones

Give a start date, an end date and three to six milestones in between. Work backward from any fixed date, such as an event. Leave buffer; first estimates are usually optimistic.

### 8. Budget and resources

State money, hours and tools. Be honest about hours: if a colleague can give four hours a week, write four, not full-time.

### 9. Risks and assumptions

List what could go wrong and what you are assuming. For each risk, add one line on what you will do about it.

- Risk: key reviewer is on leave in week three. Response: schedule review for week two.
- Assumption: the price sheet is current. Check with finance before starting.

### 10. Approval

Add names, date and version. A brief nobody signed off is a suggestion.

## Writing tips for a clear brief

- **Lead with the answer.** Put the goal and deliverables on the first screen.
- **Use plain words.** Replace "leverage synergies" with what you will actually do.
- **Keep it short.** If a section grows past a paragraph, link to a separate document.
- **Write it with the team.** Draft it, then review it together in the same document so objections surface early. [Notes](/products/notes/) supports documents like this that several people edit together.

For more on getting writing right, see our [business writing checklist](/blog/clear-business-writing-checklist/).

## Using the brief after kickoff

Treat the brief as a living reference. Use it as the agenda for the kickoff meeting, with the [meeting notes template](/blog/meeting-notes-template/) to record decisions. Link it from every related task and folder. At each milestone, reread the scope table and ask whether the work still matches. At the end, compare results against the success measures and write two lines on what you would change next time.

## Common mistakes

- **Vague goals.** If two people can read the goal and picture different results, rewrite it.
- **No out-of-scope list.** Unstated limits become arguments later.
- **Too many owners.** A project with three leads has none.
- **Skipping approval.** Without a sign-off, the brief carries no authority when priorities collide.
- **Writing it alone.** A brief drafted in isolation misses constraints the team already knows about.

## Key takeaways

- A project brief answers why, what, who, when and what is not included, in one or two pages.
- The scope section, with an honest out-of-scope list, prevents most disputes.
- Use checkable success measures and only numbers you really have.
- Get the sponsor to approve it and keep it as the reference through the project.

## Frequently asked questions

### How long should a project brief be?

One to two pages for most projects. If it needs more, link to supporting documents instead of pasting them in.

### What is the difference between a project brief and a project plan?

The brief says what you are doing and why, and sets boundaries. The plan breaks the work into tasks, dates and dependencies. Write the brief first.

### Who should approve a project brief?

The person who is paying for or sponsoring the work, plus the person accountable for delivery. Record their names and the approval date in the brief.

### Can I change the brief after the project starts?

Yes, but treat changes as decisions. Note what changed, why, and who agreed, so the brief stays a trustworthy reference.